How long does house leveling take?

The time it takes to level a house depends on the foundation type, amount of settlement, repair method, and site conditions, but hereโ€™s a realistic breakdown:

๐Ÿ— Typical Timeframes

  1. Small Adjustments (minor pier work, light shimming)
    • 1โ€“2 days
    • Common for pier-and-beam homes or slab foundations with minimal settling.
  2. Moderate Repairs (installing several piers or partial leveling)
    • 3โ€“7 days
    • Involves lifting sections of the home and stabilizing them.
  3. Major Leveling Projects (full-perimeter pier installation, extensive structural repair)
    • 1โ€“3 weeks
    • Often required when a foundation has severe settlement or multiple problem areas.

โณ Factors That Affect Timeline

  • Foundation Type โ€“ Pier-and-beam homes are usually quicker to adjust than concrete slabs.
  • Number of Piers โ€“ More piers mean more digging and installation time.
  • Soil Conditions โ€“ Expansive clay or wet soil can slow progress.
  • Weather โ€“ Heavy rain in areas like Houston can delay work due to muddy conditions.
  • Accessibility โ€“ Limited space or obstacles around the house can extend the timeline.

๐Ÿ’ก Pro Tip: In many cases, most of the leveling work is completed in a single day, but the total project including inspection, preparation, and finishing can stretch longer.